Industry

Europe Data Center Construction Market Size and Forecasts (2020 - 2030), Regional Share, Trend, and Growth Opportunity Analysis Report Coverage: By Types of Construction (Electrical Construction, General Construction, and Mechanical Construction); Tier Standards (Tier 3, Tier 4, and Tier 1 & Tier 2); Industry Verticals (IT & Telecommunication, BFSI, Media and Entertainment, Retail, Manufacturing, Government, Transportation, and Others)

Report Code : 

TIPTE100000384

No. of Pages : 132
Published Month : Feb 2024
Category : Technology, Media and Telecommunications

The Europe data center construction market size was valued at US$ 54.81 billion in 2022 and is expected to reach US$ 96.52 billion by 2030; it is estimated to record a CAGR of 7.3% from 2022 to 2030.

Analyst Perspective:

Data center construction is the physical establishment of a facility that accommodates and facilitates various IT operations and equipment for storage, processing, and management of data. The Europe data center construction market report emphasizes on the key factors driving the market and prominent players' developments.

Data Center Construction Market Overview:

Data center construction encompasses designing and constructing a data center facility that adheres to specific requirements and standards. Data center construction prioritizes the creation of a floor plan that offers sufficient space to accommodate current and future servers and equipment. This ensures that the facility can effectively manage the growing demand for data storage and processing. Data centers must be designed to withstand natural disasters such as earthquakes, floods, and storms. Construction efforts involve implementing preventive measures and mitigating their impact, including incorporating fire prevention systems and ensuring an adequate water supply for firefighting. Data center construction entails meticulous planning and design of infrastructure components such as cabling, cooling systems, power supply, and security measures. Building codes and industry standards are considered to ensure efficient and safe operations.

The construction process typically comprises several stages, including assessment, planning, design, and actual construction. Each stage requires careful consideration of business needs, facility requirements, and compliance with regulations. Data centers vary in size, capacity, and purpose. Different types and tiers exist, each possessing specific characteristics and capabilities. The design and construction of a data center depend on its intended use and the desired level of redundancy and reliability. Data center construction is a complex and critical process that necessitates expertise in areas such as architecture, electrical engineering, mechanical engineering, and IT infrastructure. Its objective is to establish a secure, reliable, and efficient environment for data storage and processing operations. The Europe data center construction market forecast is based on various sources of data and methods of analysis, such as historical trends, surveys, company developments, and white papers.

Increasing use of green data centers is expected to bring new data center construction market trends in the coming years.

The Europe data center construction market is segmented on the basis of type of construction, tier design, and industry vertical. Based on type of construction, the Europe data center construction market is segmented into general construction, electrical design, and mechanical design. Based on tier design, the Europe data center construction market is segmented into Tier 1 and Tier 2, Tier 3, and Tier 4. Based on industry vertical, the Europe data center construction market is segmented into IT and Telecommunication, BFSI, government, manufacturing, retail, transportation, media & entertainment, and others.

Rittal GmbH & Co KG, Schneider Electric SE, DPR Construction Inc, INFINITI IT Ltd, blu-3 (UK) Ltd, Datalec Power Installations Ltd, Coromatic AB Sweden, Winthrop Technologies Ltd, Mercury Engineering Ltd, and STO Building Group Inc. are among the key players that were profiled during this study of the data center construction market. Additionally, several other important market players were studied and analyzed during this research study to get a holistic view of the ecosystem.

Europe Data Center Construction MarketReport Scope

Europe Data Center Construction Market Report Scope

Report Attribute Details
Market size in 2022 US$ 54.81 Billion
Market Size by 2030 US$ 96.52 Billion
Global CAGR (2022 - 2030) 7.3%
Historical Data 2020-2021
Forecast period 2023-2030
Segments Covered By Types of Construction
  • Electrical Construction
  • General Construction
  • Mechanical Construction
By Tier Standards
  • Tier 3
  • Tier 4
  • Tier 1 & Tier 2
By Industry Verticals
  • IT & Telecommunication
  • BFSI
  • Media and Entertainment
  • Retail
  • Manufacturing
  • Government
  • Transportation
Regions and Countries Covered Europe
  • UK
  • Germany
  • France
  • Russia
  • Italy
  • Rest of Europe
Market leaders and key company profiles
  • Rittal GmbH & Co KG
  • Schneider Electric SE
  • DPR Construction Inc
  • INFINITI IT Ltd
  • blu-3 (UK) Ltd
  • Datalec Power Installations Ltd
  • Coromatic AB Sweden
  • Winthrop Technologies Ltd
  • Mercury Engineering Ltd
  • The List of Companies - Europe Data Centre Construction Market

    1. Rittal GmbH & Co KG          
    2. Schneider Electric SE          
    3. DPR Construction Inc         
    4. INFINITI IT Ltd       
    5. blu-3 (UK) Ltd       
    6. Datalec Power Installations Ltd      
    7. Coromatic AB Sweden       
    8. Winthrop Technologies Ltd              
    9. Mercury Engineering Ltd                  
    10. STO Building Group Inc
    • Save and reduce time carrying out entry-level research by identifying the growth, size, leading players, and segments in the Europe data center construction market.
    • Highlights key business priorities in order to assist companies to realign their business strategies
    • The key findings and recommendations such as specific country and segmental insight highlights crucial progressive industry trends in the Europe data center construction market, thereby allowing players across the value chain to develop effective long-term strategies.
    • Develop/modify business expansion plans by using substantial growth offering developed and emerging markets
    • Scrutinize in-depth market trends and outlook coupled with the factors driving the market, as well as those hindering it
    • Enhance the decision-making process by understanding the strategies that underpin commercial interest with respect to client products, segmentation, pricing, and distribution
    Download Sample

    Frequently Asked Questions

    What will be the market size for Europe data center construction market by 2030?

    The Europe data center construction market is expected to reach US$ 96.52 billion by 2030.

    Which country/region is holding the major market share of Europe data center construction market?

    The rest of Europe held the largest market share in 2022, followed by Germany and UK.

    Which is the leading type of construction segment in the Europe data center construction market?

    The electrical construction segment held largest market share in 2022 and it is expected to grow with the highest CAGR during the forecast period 2023-2030.

    Which are the key players holding the major market share of Europe data center construction market?

    The key players, holding majority shares, in Europe data center construction market includes DPR Construction Inc., Mercury Engineering Ltd, Winthrop Technologies Ltd, Rittal GmbH & Co KG, and Schneider Electric SE.

    What are the future trend of the Europe data center construction market?

    Increasing use of green data centers is the future trend of the data center construction market.

    What are the driving factors impacting the Europe data center construction market?

    Factors such as emergence of edge computing and rapid expansion of IoT services are driving the Europe data center construction market growth.

    What is the estimated Europe market size for the data center construction market in 2022?

    The Europe data center construction market was valued at US$ 54.81 billion in 2022 and is projected to reach US$ 96.52 billion by 2030; it is expected to grow at a CAGR of 7.3% during 2022–2030.